• This email address is being protected from spambots. You need JavaScript enabled to view it.
Field of Dreams Weather Protection to 2 Courts
Field of Dreams Weather Protection to 2 Courts

#3114 Field of Dreams

APPLICATION OF PROJECT: Sports Court Canopy

PROJECT DESCRIPTION:

A specialised canopy structure was commissioned for the Field of Dreams project at Oxford Falls Grammar School in New South Wales, Australia. The design aimed to provide weather protection for two competition playing courts situated on the upper level of a two-story building, covering 2,200 square metres.

In addition to the canopy made of PTFE, stainless steel mesh was incorporated around the perimeter of the open-air facility. The rated mesh effectively enclosed the area and acted as a barrier to prevent equipment from falling through and provided fall protection for users of the courts all while maintaining adequate air circulation.

DESIGN / FABRICATION / INSTALLATION BRIEF

The Field of Dreams project at Oxford Falls Grammar School required a bespoke canopy for two basketball courts on Level 1 of their precinct in Sydney, Australia, spanning 2,200 square metres. The client sought a solution that would provide effective weather protection for athletes and spectators while integrating seamlessly with the school's architecture.

Our response involved designing, fabricating, supplying, delivering, and installing a PTFE tensioned fabric roof structure. This choice of material was selected for its durability and weather resistance, ensuring long-term functionality and protection. The design not only met the practical needs of weather coverage but also aligned aesthetically with the existing architectural elements of the Field of Dreams precinct. Our approach ensured that the canopy was both a functional and visual asset, enhancing the overall environment while fulfilling the client's specific requirements.

STRUCTURAL SYSTEMS

The Field of Dreams project required meticulous planning and innovative execution techniques. The suspended slab’s installation above ground level posed unique challenges, necessitating specialised equipment and methods for precise material handling and positioning. Strategic planning was crucial, addressing limited access by coordinating logistics for material delivery and equipment operation while ensuring worker safety and structural stability.

Advanced simulation and modelling were employed to predict and manage load distribution and spatial constraints. The final solution integrated geometric forms with structural needs, accommodating the challenging site conditions and meeting the design intent. Through careful consideration and detailed planning, the project overcame its challenges, resulting in a functional and aesthetically pleasing structure.

MATERIALS

FGT-800 PTFE was selected for its strength, durability, and capacity to provide various levels of translucency that complement the intricate geometry of the design. Additionally, its self-cleaning properties make it an ideal choice for a sports court canopy.

FABRICATION

The fabric panels were designed with precise patterns to align seamlessly with the installation timeline. This strategic planning enabled swift and efficient tensioning of the fabric across the cable bay arches, ensuring a smooth installation process and a secure, well-fitted finish.

COLLABORATION, CONSTRUCTION AND MAINTENANCE

The Field of Dreams project demonstrated exemplary collaboration, construction, and maintenance strategies. For restricted access areas, our team coordinated meticulously through regular meetings to overcome challenges and ensure smooth task execution. Executing tasks on a suspended slab required specialised equipment and precise safety measures, alongside strategic planning to address dynamic conditions effectively. This forward-thinking approach allowed us to adapt swiftly to any unforeseen issues.

Our maintenance program includes regular inspections and preventative upkeep to ensure the structure’s long-term integrity. These methods collectively ensured that the project was completed efficiently and continues to be maintained to high standards.

COSTS

The Field of Dreams project was valued at AUD$1.68m.

COLOUR IMAGES

 

311402
311401
311404
311403
311405
311406
311407
311408
311409
311410
311410
311412
311411

Filename

Caption

3114_01

Exterior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_02

Exterior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_03

Interior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_04

Interior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_05

Exterior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_06

Exterior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_07

Exterior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_08

Exterior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_09

Exterior Shot of Field of Dreams, Oxford Falls (Paramount Studios)

3114_10

Interior Shot of PTFE Bleaching During Construction

3114_11

Aerial Shot of Construction

3114_12

External Shot of Construction of Field of Dreams, Oxford Falls