Medium Fabric Structures

In terms of our LSAA Design Awards, a Medium sized Fabric Structure, or tensioned membrane structure, would have a surface area of between 250 and 1000 sqm.

Tensioned fabric or membrane structures of this size are often of one geometric form such as a conical structure with a central bale ring attached to a mast or tied down. The perimeter could be a series of edge cables, trusses or beams. If multiple units are used they the final structure may fall into the "large" category.

Other forms could be panels with internal diagonal arches, crossed arches, barrel vaults with intermediate valley cables. Sample structures in the following image gallery.



The following articles are in random order whilst the (separate) List of Medium Structures is in order of most recently modified article first. As of May 2025 approximately 42 articles are available.


 

Isa Royal Military College Grand Stand
Isa Royal Military College Grand Stand

 

Entrant: Light Weight Structures Advisory Service - Engineering Fabrication Installation
Location: Isa Royal Military College - Kingdom of Bahrain
Client:  Alasco Group & Al Alaa Shade Company
Struct. Eng.: Trevor Scott & Jeremy Hunter
Specialist: LTWSAS
Builder & Fabricator: Al Alaa Shade Company

This project was entered in the LSAA 2009 Design Awards (Cat 2, Medium Fabric Structures #24558)

General shot of shade structures
General shot of shade structures

M6 Community Recreational Facility Description

As part of Transport NSWs upgrade to the M6 freeway Stage 1 development, new recreational facilities were developed to provide shade to the community in various areas including McCarthy and Brighton Reserve. As part of the McCarthy Reserve upgrade, Fabritecture was contracted for the design and construction of eight (8) structures to provide shade cover for recreational facilities over a playground. The structures feature both Gale Pacific 95 Mesh and architecturally perforated aluminium.

Mildura Riverfront Performance Venue - Corner Connection Detail
Mildura Riverfront Performance Venue - Corner Connection Detail

This project was entered in the LSAA 2009 Design Awards (Cat 2, 2397)

Entrant: Oasis Tension Structures (Australia) Pty Ltd
Location: Hugh King Boulevard - Mildura VIC

Application: This large PVC structure was created to provide a spectacular shelter from which entertainment of all descriptions can operate under cover in the picturesque environment of the banks of the Murray River in Mildura.

Canopy over Inner City Child Care Centre
Canopy over Inner City Child Care Centre

Credits - Entered by MakMax

Category: Tension structures - (coated fabrics) less than 500sqm
Client: W. Eggerking & Co Pty Ltd
Engineer: Tensys, Peter Lim
Fabric: Hiraoka 212-II SAC
Date completed: 21 February 2012
Address: 60 Margaret Street, Sydney NSW 2000
Size: 600sqm
Steel Supplier: Steelman
Fabric Supplier: Hiraoka Australia
Installer: Sydrig

Covering an area surrounded by buildings and infrastructure can be challenging, this project succeeds in proving 300sqm of covered space to a Sydney inner city child care centre. Our client requested a complete coverage solution to an odd shaped terrace area in Sydney’s inner city.

Hornsby Aquatic Seating Covered Areas
Hornsby Aquatic Seating Covered Areas

 

This project was entered in the LSAA 2016 Design Awards (Cat 2, Medium Fabric Structures 1293)

Entrant: Shade And Membrane Structures Australia (Design / Project Management / Install)

Location: Hornsby, NSW.   Completed: April 30 2014

Client: ADCO Constructions / Hornsby City Council

Team: Peter Hunt Architects, Larry Shyu Global Membrane Design, ADCO Constructions, Shadecom / Fabric Solutions

Application: To design, engineer, fabricate and install approximately 400 sqm of waterproof shade structures to cover two seating areas.

Penguin Parade Phillip Island
Penguin Parade Phillip Island

This project was entered in the LSAA 2011 Design Awards (Cat 2, 2600)

Entrant: Tensys Engineers

Aside from the images below, no further details have been entered at this stage.

This is a replacement structure for the one built in 1989 that was damaged in a storm